Time to plan the Lake at the Moulin de Bonnemorte

Well its been really busy at work for the last week and so far it has been difficult to get in and structure the blog, I have been sorting out my pictures into categories so that the timeline will be accurate.

At the same time we need to keep the renovation going at full momentum, this means our trusted builder Mark Sabastini will be able to work right through the summer and into the Autumn. If we are able to keep this momentum the the Moulin will be completely renovated externally before the Winter and that will leave us the second fix inside.

The other major works of importance will be the construction of the lake, I want the Moulin to have a good quality and very beautiful lake that is natural and shaped around trees and land countours. It will need to support some high quality Carp and possibly a few Catfish but of course the Lake will need time to naturalise first.

That means I need it dug asap so the natural process of insect life and plant life can begin and the lake populated with a really high quality wildlife hierarchy.

I am awaiting the feedback at present from the architect who is discussing this with the authorities and I am quite excited about this aspect, who knows maybe we will find the stash of Napoleonic guns that are rumoured to be buried in the grounds……..

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google

About the Author